Greenlink Interconnector Rerouted to Preserve Dobby Memorial

2 min read
Source: The Independent
Greenlink Interconnector Rerouted to Preserve Dobby Memorial
Photo: The Independent
TL;DR

The £430m Greenlink interconnector, designed to link the UK and Irish power grids, was rerouted to avoid disturbing a fan-made memorial to the fictional character Dobby at Freshwater West beach in Pembrokeshire. Project manager Simon Ludlam confirmed that hundreds of complaints forced the diversion, ensuring the cable bypasses the site while still connecting the National Grid to Ireland.

Key points

  • The Greenlink project, valued at £430m, involves a 125-mile cable connecting County Wexford in Ireland to Freshwater West in Wales.
  • Fans objected to the original route, which would have passed directly through a memorial to Dobby, a character from the Harry Potter films.
  • Project manager Simon Ludlam stated that the company received hundreds of calls after a BBC interview highlighted the route.
  • The cable was rerouted to avoid the memorial, though it still passed near Bronze Age remains, which were noted in planning documents.
  • The National Trust had previously agreed in 2022 to keep the memorial in place but urged visitors not to leave souvenirs due to environmental concerns.

Background

This incident follows previous disputes over the memorial, including a 2022 consultation where the National Trust agreed to its retention but warned against leaving items like socks on the pebble structure. The Greenlink project is part of broader efforts to integrate renewable energy sources between the UK and Ireland.

How outlets are covering it

The Independent and BBC reported on the fan-driven diversion, emphasizing the impact of public outcry on infrastructure planning. Recharge News highlighted the project's role in transporting wind and solar power, noting the initial shock of the project manager to the complaints. The Telegraph was inaccessible due to a security error, so its perspective could not be assessed.

Why it matters

The rerouting of a major energy infrastructure project due to cultural and fan-driven concerns highlights the intersection of public sentiment and large-scale engineering. It also underscores the sensitivity of archaeological and cultural sites in the planning process, even for fictional memorials.

What to watch

The Greenlink project is expected to proceed with the new route, connecting the UK and Irish power grids. Further monitoring of the site may be required to ensure the memorial remains undisturbed.

Share this article

Want the full story? Read the original reporting

Read on The Independent