Heat Keeps Downtown Chicago Bridge Open for Hours, Causing Citywide Traffic Snarl

TL;DR Summary
The DuSable Lake Shore Drive bridge in downtown Chicago was opened for a scheduled lift to permit river access for the Spirit of Chicago, but a heat-related issue left the span stuck open for about four hours (roughly 10 a.m.–2:30 p.m.), forcing the closure of motor, bike and pedestrian traffic, prompting police reroutes and firefighters to spray water to cool the 200-foot steel span and triggering gridlock on Lake Shore Drive and surrounding streets.
- Heat Shuts Down Lake Shore Drive Bridge For Over 4 Hours, Causing 'Incredibly Hectic' Day Of Traffic Block Club Chicago
- Chicago hot weather: DuSable Lake Shore Drive Bridge, Torrence Avenue Bridge malfunction with heat index over 100 forecast ABC7 Chicago
- DuSable Lake Shore Drive bridge reopens after Chicago heat prompts closure fox32chicago.com
- Another Chicago bridge gets stuck in sweltering heat hours after DuSable Lake Shore Drive bridge reopens Chicago Sun-Times
- Hot weather in Chicago leads to stalled bridges, people seeking relief CBS News
Reading Insights
Total Reads
1
Unique Readers
3
Time Saved
15 min
vs 16 min read
Condensed
98%
3,035 → 74 words
Want the full story? Read the original article
Read on Block Club Chicago