Emergency Bridge Joint Repair Shuts Down I-5 South in Portland

1 min read
Source: Fox 12 Oregon
Emergency Bridge Joint Repair Shuts Down I-5 South in Portland
Photo: Fox 12 Oregon
TL;DR

All southbound lanes on Interstate 5 in Portland will be closed for emergency repairs due to a failed bridge joint, diverting traffic to Interstate 405 and the Fremont Bridge. The joint, located on a stretch of the freeway over Greeley Boulevard, has caused concrete to crack and drop onto the ground, creating a large pothole. The closure is expected to last until midnight for repairs by the Oregon Department of Transportation.

Share this article

Want the full story? Read the original reporting

Read on Fox 12 Oregon