Two Reefs, One Mission: Surf and Shoreline Resilience from Albany to the Gold Coast

TL;DR Summary
Two artificial reefs—Midds Reef at Middleton Beach in Albany and the Palm Beach Artificial Reef on the Gold Coast—are showcased as results-driven examples of coastal engineering and community collaboration. Opened in 2025, Midds Reef boosted surf access and improved beach shape (winter days with 100+ waves rose from under 5% to about 51%), while PBAR endured Cyclone Alfred and helped preserve sand, aided by a closer-to-shore design and heavier rock, demonstrating how data-driven design and surfer input can deliver both recreation and coastal protection.
Reading Insights
Total Reads
1
Unique Readers
2
Time Saved
28 min
vs 29 min read
Condensed
99%
5,686 → 84 words
Want the full story? Read the original article
Read on Surfline