
Winnipeg Completes Steep Microtunnel to Replace Failed River Sewer Pipes
Erritt Construction completed a 1,148-foot microtunnel under Winnipeg’s Red River, replacing failed sewer lines with a new concrete sleeve and HDPE pipes. The drive involved steep grades and hard rock, costing C$26.6 million.