NASA's Artemis IV Plan Hinges on Unproven Starship Orbital Refueling

2 min read
Source: Jalopnik
NASA's Artemis IV Plan Hinges on Unproven Starship Orbital Refueling
Photo: Jalopnik
TL;DR

NASA has detailed a complex orbital refueling sequence for SpaceX’s Starship to support the 2028 Artemis IV crewed lunar landing. Estimates for required tanker launches vary wildly, from 6 to 22, due to untested cryogenic transfer technology. Blue Origin offers a simpler alternative, but SpaceX retains the contract for now.

Key points

  • NASA outlined a multi-phase refueling architecture where Starship tankers fill a depot in low Earth orbit, which then fuels the lunar lander.
  • The Aerospace Safety Advisory Panel estimates 22 launches are needed, while Elon Musk claims the number will be 6 to 8.
  • SpaceX plans to test orbital propellant transfer in early 2027, a critical milestone before the 2028 crewed mission.
  • Blue Origin’s New Glenn proposal requires only four launches but faces reliability concerns from previous launchpad explosions.
  • Astronauts will travel to Earth orbit on NASA’s Orion capsule, then dock with the refueled Starship lander.

Background

NASA restructured its Artemis program in late 2026, designating Artemis III as a 2027 low-Earth orbit test for landers and Artemis IV as the first crewed lunar landing in 2028. This shift follows delays in SpaceX’s development and a re-competition of the lander contract, which allowed Blue Origin to enter the race.

How outlets are covering it

Jalopnik highlights the logistical nightmare of 22 refuelings, noting Musk’s optimistic 6-8 estimate and the risk of launch cadence failures. Space and SatNews emphasize the technical complexity of cryogenic propellant transfer and the staggered orbital staging required to reduce fuel needs. Shattered.io stresses that no official launch count exists, labeling all specific numbers as unconfirmed secondary reporting. All sources agree that orbital refueling is unprecedented and untested, but they differ on whether the challenge is insurmountable or merely complex.

Why it matters

The success of Artemis IV depends on mastering orbital refueling, a capability never before demonstrated. Failure could delay the 2028 landing or force NASA to switch to Blue Origin’s simpler but less proven lander, impacting the broader goal of sustained lunar exploration.

What to watch

SpaceX will conduct its first orbital refueling test in early 2027. NASA will evaluate the results to decide whether to retain SpaceX or switch to Blue Origin for Artemis IV. The outcome will determine the feasibility of the 2028 crewed lunar landing timeline.

Share this article

Want the full story? Read the original reporting

Read on Jalopnik